Sichuan Unicom IDC micro-module project
Project overview Phase One: Located on the first floor of the Unicom company's business building, it uses 5 sets of 44-cabinet cold channels, each with a total power consumption exceeding 220KW for high heat density cold channels. The total installed capacity of UPS is 1800KVA. Phase Two: Located on the third floor of the company's computer room building, it uses 6 sets of 50-cabinet cold channels plus half a set, each with a total power consumption of over 220KW for high heat density cold channels. The total installed capacity of UPS is 2400KVA. Achievements Phase One: Includes row-based air conditioning, room-level precision air conditioning, precision power distribution cabinets, cabinets, cold channels, movements and so on. About 4 million. Phase Two: Includes row-based air conditioning, room-level precision air conditioning, precision power distribution cabinets, cabinets, cold channels, movements, etc. About 6 million.