Project overview
Crowe Horizon Phase III data centre construction, data centre total area: nearly 16,000 square meters, data centre mainframe room using high-density cabinets, mainly serves the Meituan localised computing power business.
Achievements
This project uses 200KW down-flow chilled water precision air conditioning in the mainframe room, and the modular room uses a height of 2.5 metres, with a single-cabinet load of 8KW customised server cabinets, customised closed cold-channel arrangement, and a total of about 60 precision air conditioners, including 20-200KW air-cooled and chilled-water air conditioning of various series, as well as 20 sets of modular channels and more than 500 sets of cabinets.